top of page
Charging Station
AC Charging Solution
Increase power availability
Make good use of smart energy control BMS to allocate power sources (grid, energy storage, green energy)
Peak Shaving to reduce grid stress
Shave consumption peaks and cut demand rate cost.
Time of use to optimize cost
Time-dependent use of functions.
Integration of renewable energy
Use more energy from renewable sources and minimize feed in.
The setup is fast, no civil works are required, the modular design is combined with outdoor small energy storage, so the setup is faster and can be completed in about 2-3 weeks.
It can be set up with the solar version and combined with the locomotive charging station/swapping station to reduce the mains power and not be limited by normal power consumption.
DC Charging Solution
A Supercharger Station Integrated DC Fast Charger with energy storage system, small footprint, standardized integration of equipment.
Integrate effective complete sets of exports! Appearance simple and neat, full of modernity, have both charging efficiency and area landmarks!
Increase power availability
Peak Shaving to reduce grid stress
Time of use to optimize cost
Integration of renewable energy
Software and Service
-
Energy Balance and Management
-
Backend Software for Charger and PCS Monitoring and Maintenance
-
Customized Fleet Management Solution
-
Local and Remote Support
bottom of page